Zigloo or Igloo? Zigloo Domestique nearing completion
NEWS Group Sept. 1, 2006
Zigloo Domestique June 06
Domestique May 06
Zigloo Media Release
Zigloo Domestique The Plans Domestique April 06 - Major Progress
Domestique Mar 06
Domestique Feb 06 - The site
Bauhaus Bedside Table Design
View-dio Small Custom Building Design
House on a Rock |
Nearing completion: Exterior progress 1 In mid-August the structure was closed in when windows and sliding glass doors arrived and were installed. top Nearing completion: Exterior progress 2 The black flashing detail covers the waterproof membrane providing a weatherproof barrier for the connection between containers. top Nearing completion: Exterior progress 3The balcony frames were craned into place with the railing posts welded on and rust proof paint already in position. The balcony frames were craned into place with the railing posts welded on and rust proof paint already in position. top Nearing completion: Exterior progress 4 The balconies make use of the corrugated steel panels that were removed from the containers. The steel panels make up the pans that the concrete finish is poured onto. The balconies are ready now for the chain link railings. top Nearing completion: Interior progress 1 The interior in late August showing the framework that supports the wiring, plumbing, insulation and wall finish. top Nearing completion: Interior progress 2 The spray-foam insulation is a more expensive way to insulate than traditional fiberglass insulation batts, but it is a necessary technology to reduce the thickness of the wall assembly. It also provides a completely continuous thermal barrier between the container and interior finishes. top Nearing completion: Interior progress 3 The drywall phase really gave us an indication of how the finished space feels. top Nearing completion: Interior progress 4 The painted finish allows for the installation of trims, other finished materials and cabinetry. top Nearing completion: Interior progress 5 With the cabinet boxes, feature living room ceiling and heated (acid stained) concrete floor in place, the final details of the main floor can be completed. top Nearing completion: Interior progress 6 Looking north through the main floor ... one can finally get the real feeling for the interior aesthetic. top Nearing completion: Interior progress 7 The feature living room ceiling is dropped to help define the living room area in the main (open) floor plan. top Nearing completion: Interior progress 8 The lower floor has a fresh bright feeling and the heated (acid stained) concrete floor. top Nearing completion: Interior progress 9 The Master Bedroom and the largest balcony look back roughly 100 feet to the front property line at Fernwood Road. top Nearing completion: Interior progress bamboo The upper floor and staircase are finished with great looking, environmentally sustainable bamboo flooring. top |